Monday, April 23, 2012

18 Green Extension

We removed the sod for the green extension and used it to patch some bad spots in fairways. The cavity for the extension has been filled with new root zone mix and graded to the specifications of the master plan. We hope to have all of the new sod in place by the end of the week.



- Posted using BlogPress from my iPad

Location:LGCC

No comments:

Post a Comment