Following the aeration the gas delivery tubes are placed on the green and then the green is covered with an impermeable plastic cover and the edges sealed so no gas can leak from under the cover. Once the green cover is sealed tight a computer controls the proper dose of methyl bromide gas that is pumped through the delivery tubes. The covers will stay in place for a minimum of five days.
No comments:
Post a Comment