Monday, March 14, 2011

Bridge Relocation

One of our wintertime projects this year was to move the bridge on #2 out of the sight line from the tee. We moved the bridge while the ground was frozen to minimize any turf damage as a result of using heavy equipment to lift the bridge.  We will finish the alignment of the cart path as soon as the frost is out of the ground.

No comments:

Post a Comment