One of our wintertime projects this year was to move the bridge on #2 out of the sight line from the tee. We moved the bridge while the ground was frozen to minimize any turf damage as a result of using heavy equipment to lift the bridge.
We will finish the alignment of the cart path as soon as the frost is out of the ground.
No comments:
Post a Comment